Templates - Manufacturing

Departments:

Engineering & Product Development

IT & Systems

Plant Management & Operations

PMO

Quality & Regulatory Compliance

Sales & Marketing

Supply Chain & Procurement



Engineering & Product Development

Name Description and Estimated Duration (Days)
Compliance & Regulatory Certification Project This project guides teams through the process of obtaining regulatory certification (e.g. CE, UL, RoHS, FDA) for a new or modified product, including planning, testing, documentation, and external submission. Total Duration: 70-100 working days
Custom Product Configuration Setup This project supports the development of a customer-specific version of an existing product -- typically involving modifications in dimensions, materials, firmware, or packaging. Total Duration: 60-75 working days
Design for Manufacturability (DFM) Study This project analyzes a product design to improve manufacturability, reduce assembly complexity, and align with shop floor and tooling capabilities. Total Duration: 40-55 working days
Design of Experiments (DOE) Execution This project applies structured experimentation (statistical DOE) to optimize a product design or process by studying multiple variables and their interactions. Total Duration: 35-50 working days
ECO Backlog Reduction Sprint This sprint-style project is designed to rapidly reduce a large backlog of open Engineering Change Orders (ECOs). It uses a focused team, daily triage, and parallel execution to resolve technical debt and restore engineering flow. Total Duration: 30-45 working days
Emergency Issue Response Project This project enables a rapid, cross-functional response to urgent production or field issues that threaten delivery, safety, or quality. Designed for quick containment, root cause analysis, and corrective action. Total Duration: 15-25 working days
Engineering Change Order (ECO) Implementation This project manages changes to existing products or processes through formal Engineering Change Orders, from request to implementation. Total Duration: 30-45 working days
Engineering Document Control & Revision Update This project governs the review and update cycle for engineering documentation (drawings, specs, procedures) to ensure version control, regulatory compliance, and accuracy in production environments. Total Duration: 25-35 working days
Engineering Skills Matrix & Training Plan This project creates a skills matrix to assess engineering team capabilities, identify gaps, and build a customized training roadmap. Total Duration: 25-35 working days
Failure Mode & Root Cause Analysis (RCA) This project investigates a recurring product or process failure, identifies the root cause, and recommends and validates corrective actions to prevent recurrence. Total Duration: 40-60 working days
Fixture Design & Fabrication Project Used to develop fixtures for assembly, testing, or inspection processes. These projects improve ergonomics, repeatability, or reduce operator variability. Total Duration: 40-60 working days
IP / Patent Filing Project This project documents and files a patent or trade secret to protect product innovations, including claims documentation, legal review, and coordination with IP counsel. Total Duration: 45-60 working days
KPIs & Engineering Metrics Dashboard Build This project sets up a live or recurring dashboard that reports on engineering team metrics such as design velocity, defect closure rate, test throughput, and productivity. Total Duration: 30-45 working days
Lab Equipment Setup or Reconfiguration This project helps technical teams set up new lab workstations or reconfigure existing ones for new projects or test protocols. Total Duration: 25-40 working days
New Material or Component Integration This project manages the technical and logistical steps to qualify and integrate a new material or part into an existing product design. Total Duration: 55-75 working days
New Product Development (NPD) Lifecycle This project outlines the complete lifecycle of developing a new product in a manufacturing company, from initial concept through launch. It supports cross-functional collaboration between R&D, Engineering, and Product teams and is structured for full visibility and phase-gate decision-making. Total Duration: 120-160 working days
Obsolescence / End-of-Life (EOL) Product Planning This project supports sunsetting a product or component by evaluating impact, informing customers, managing inventory, and planning replacements. Total Duration: 45-65 working days
Process Innovation & Optimization Project This initiative aims to improve a specific manufacturing process (e.g. throughput, quality, energy usage) through design changes, automation, or lean improvements. Total Duration: 60-80 working days
Product Line Extension Development This project supports the addition of new variants (sizes, features, models) to an existing product line, ensuring strategic alignment and technical feasibility while minimizing time-to-market. Total Duration: 90-110 working days
Product Platform Architecture Design This project involves creating a flexible product platform architecture that supports multiple variants or modules, improving scalability and cost efficiency. Total Duration: 90-120 working days
Product Redesign for Cost Reduction This project aims to identify and implement design changes that lower production costs while maintaining product quality, performance, and compliance. The process involves value engineering, cost analysis, and supply chain collaboration. Total Duration: 80-100 working days
Prototype Testing & Evaluation This project validates new or revised designs through structured prototype builds and tests to ensure they meet technical, functional, and safety requirements. Total Duration: 40-60 working days
Rapid Design Iteration Project Used for quickly testing and implementing small design changes in response to customer feedback, internal discovery, or market trends. These are short-cycle, high-impact iterations typically done in early-stage development or pilot phases. Total Duration: 25-35 working days
Reliability Engineering Initiative This project focuses on analyzing and improving a product's long-term reliability through lifecycle testing, field data analysis, and design recommendations. Total Duration: 75-100 working days
Supplier Qualification & Approval Project This project qualifies a new supplier to support a component, sub-assembly, or service used in the product development lifecycle. Total Duration: 40-60 working days
Sustaining Engineering Support Project This ongoing project supports improvements and issue resolution for existing products already in production. It includes defect resolution, performance upgrades, and minor product updates. Total Duration: 30-50 working days (per issue cycle)
Technical Documentation Development This project develops or updates technical documentation such as product manuals, installation guides, spec sheets, and engineering drawings to support internal and external users. Total Duration: 30-45 working days
Technology Scouting or Feasibility Study This project explores and evaluates new technologies or methods (e.g., sensors, AI, materials) to determine feasibility for integration into future products or processes. Total Duration: 30-45 working days
Test Method Development & Validation This project supports engineering teams in creating or revising test methods to ensure repeatable, reliable, and standards-compliant testing of components, subsystems, or full products. Total Duration: 35-50 working days
Tolerance Stack-Up Analysis This project supports teams in identifying risk areas in precision assemblies by calculating the impact of dimensional tolerances across multiple parts or subassemblies. Total Duration: 20-30 working days
Tooling Design & Validation Project This project involves designing, building, and validating new tooling (molds, jigs, dies, fixtures) needed for manufacturing a new or updated product. Total Duration: 60-90 working days
Value Engineering Initiative This project involves a systematic analysis of product functions to reduce cost and improve value without compromising quality. It integrates engineering creativity, cost modeling, and supplier input. Total Duration: 75-90 working days

return to menu

IT & Systems

Cloud Strategy and Hybrid Infrastructure Design Designs a cloud or hybrid cloud infrastructure model for ERP, file storage, backups, and application hosting. Estimated Duration: 36 working days
Cybersecurity Risk Assessment & Remediation_ Assesses cyber vulnerabilities across IT and OT networks and implements prioritized mitigation controls. Estimated Duration: 30 working days
Data Warehouse & Reporting System Deployment Builds a centralized data warehouse for ERP, MES, SCM, and QA data sources, and connects it to BI tools for actionable analytics. Estimated Duration: 40 working days
Disaster Recovery and Business Continuity Planning Creates a comprehensive plan for IT disaster recovery and continuity of critical manufacturing systems. Estimated Duration: 30 working days
Endpoint Detection & Response (EDR) Monitoring Monitors alerts and trends from EDR tools (e.g., CrowdStrike, SentinelOne) and investigates suspicious activity. Estimated Duration: 11 working days
ERP System Upgrade or Migration This project involves upgrading the existing ERP system or migrating to a new platform to improve functionality, system performance, and integration with production and business systems. Estimated Duration: 60 working days
Factory Network Infrastructure Modernization Upgrades and modernizes plant network architecture to improve reliability, bandwidth, security, and support for IoT and automation systems. Estimated Duration: 38 working days
Helpdesk Ticket Management Process Ensures structured intake, triage, assignment, and closure of IT support requests. Estimated Duration: 12 working days per cycle
IoT Integration for Smart Factory Devices Connects factory equipment (sensors, PLCs, HMIs) to IoT platforms for real-time monitoring, alerts, and analytics. Estimated Duration: 35 working days
IT Asset Lifecycle Management Tracks procurement, assignment, usage, and disposal of IT hardware assets. Estimated Duration: 15 working days
License & Subscription Renewal Management Tracks software and system licenses, ensures timely renewals, and prevents compliance or access issues. Estimated Duration: 14 working days
Manufacturing Execution System (MES) Implementation Deploys a Manufacturing Execution System to connect, monitor, and control manufacturing processes from ERP to shop floor. Estimated Duration: 45 working days
Monitoring System Alerts & Escalation Workflow Reviews alerts from monitoring systems (e.g., Zabbix, PRTG, SolarWinds) and manages escalation for response. Estimated Duration: 10 working days per cycle
Monthly Patch Management & Compliance Reporting Applies critical system and security patches to maintain compliance and prevent vulnerabilities. Estimated Duration: 13 working days
Routine Backup Verification & Restore Testing Ensures system backups are running as scheduled, data is recoverable, and restores are tested monthly. Estimated Duration: 12 working days
SCADA System Hardening and Upgrade Secures and modernizes the Supervisory Control and Data Acquisition (SCADA) system to prevent cyber threats and system downtime. Estimated Duration: 34 working days
Single Sign-On (SSO) & Identity Access Management (IAM) Rollout Deploys a centralized identity system with SSO and IAM policies for secure and streamlined access across platforms. Estimated Duration: 30 working days
User Access Review & Cleanup (Quarterly) Reviews user accounts across systems to remove stale access and enforce least privilege. Estimated Duration: 14 working days
User Onboarding & Offboarding Workflow Execution Automates account creation, provisioning, and deactivation for employees and contractors. Estimated Duration: 10 working days per cycle
Weekly IT System Health Check and Reporting A structured weekly review of infrastructure health, system uptime, capacity, and incident logs. Estimated Duration: 9 working days per week

return to menu

Plant Management & Operations

Name Description and Estimated Duration (Days)
Business Continuity & Disaster Recovery Planning This project establishes proactive processes and protocols to minimize operational disruption due to natural disasters, supply failures, cyberattacks, or power outages. Estimated Duration: 40-60 working days
Capacity Expansion or Bottleneck Elimination Project This project increases production throughput by expanding capacity or addressing key constraints. May involve equipment upgrades, process rebalancing, or shift structure changes. Total Duration: 70-100 working days
Changeover Time Reduction (SMED) Project This project applies SMED (Single-Minute Exchange of Die) principles to reduce machine changeover time and increase uptime. Estimated Duration: 15-25 working days (per line)
Daily/Weekly Production Planning & Scheduling This recurring project ensures production plans are aligned with customer demand, inventory, labor, and equipment availability through daily and weekly scheduling processes. Estimated Duration: 5 working days (recurs weekly)
Downtime Tracking & Root Cause Elimination This recurring project captures equipment downtime data, analyzes causes, and implements corrective actions to reduce unplanned stoppages. Estimated Duration: 10-20 working days (biweekly/monthly loop)
Employee Engagement & Suggestion Program Setup This project launches a structured feedback and suggestion process to empower operators and supervisors to share improvement ideas. Estimated Duration: 30-45 working days
ESG (Environmental, Social, Governance) Metrics Rollout This project establishes systems to track and report ESG metrics relevant to operations, including energy use, waste, DEI, and compliance. Estimated Duration: 45-60 working days
Facility Expansion or Renovation Planning This project enables the safe, compliant, and efficient expansion or renovation of manufacturing space -- including layout changes, utilities planning, construction coordination, and phased re-occupation. Estimated Duration: 90-150 working days
Factory Energy Efficiency & Sustainability Initiative This project reduces energy consumption and improves sustainability performance across the plant via upgrades, audits, and awareness. Estimated Duration: 60-90 working days
Gemba Walk Program Launch & Sustainment This project formalizes a structured Gemba Walk program to improve leadership visibility, team feedback, and continuous improvement engagement on the floor. Estimated Duration: 20-30 working days (initial setup)
Internal Audit Readiness for External Inspections This project prepares the facility for external regulatory, ISO, or customer audits by ensuring documentation, practices, and corrective actions are current and accessible. Estimated Duration: 30-45 working days (pre-audit cycle)
Internal Quality Non-Conformance (NC) Investigation This recurring project investigates and resolves defects or process failures identified during production that don't meet internal specs. Estimated Duration: 5-10 working days (per NC event)
Inventory Accuracy Improvement Project This recurring initiative improves accuracy between physical inventory and system records, reducing shrinkage, mispicks, and downtime due to material discrepancies. Estimated Duration: 10-15 working days (monthly or quarterly cycle)
ISO 9001 / Quality Management System (QMS) Implementation This project sets up and certifies a QMS aligned to ISO 9001 standards, including process mapping, documentation, training, and audit preparation. Estimated Duration: 90-120 working days
Labor Productivity & Work Cell Efficiency Study This project measures operator time utilization and workstation efficiency through direct observation and analytics, leading to rebalance or layout changes. Estimated Duration: 30-50 working days
Lean Manufacturing Implementation (5S, Kaizen, etc.) This project introduces Lean principles to improve efficiency, reduce waste, and drive a culture of continuous improvement across the plant. Total Duration: 70-90 working days
Manufacturing Cost Reduction Program This cross-functional project targets reductions in production cost through material savings, labor efficiency, energy optimization, or process changes without compromising quality. Estimated Duration: 60-90 working days
New Production Line Setup & Commissioning This project encompasses the planning, installation, validation, and go-live of a new production line within an existing or new facility. It includes cross-functional coordination with engineering, maintenance, safety, and operations teams to ensure the line meets capacity, quality, and compliance standards. Total Duration: 100-130 working days
Noise & Air Quality Assessment & Remediation Project This project evaluates noise and air quality in the facility and implements remediation measures to meet safety, comfort, and OSHA requirements. Estimated Duration: 40-60 working days
Overall Equipment Effectiveness (OEE) Improvement Initiative This project aims to increase equipment availability, performance, and quality rates using root cause analysis and daily performance management tools. Total Duration: 60-80 working days
Plant Layout Optimization or Reconfiguration This project focuses on reorganizing existing plant layout to reduce material handling time, improve flow, enhance safety, and increase capacity utilization. Total Duration: 60-85 working days
Preventive Maintenance Execution Cycle This recurring project keeps machines in optimal condition by executing scheduled preventive maintenance tasks, inspections, and documentation reviews. Estimated Duration: 10 working days (typical monthly cycle)
Production Digitization / MES Integration Project This project integrates a Manufacturing Execution System (MES) into the plant, enabling real-time tracking of production, quality, and performance metrics. Estimated Duration: 90-130 working days
Production KPI Dashboard Management This project maintains and updates visual performance boards and digital dashboards that track production metrics like output, scrap, OEE, and labor productivity. Estimated Duration: 5-10 working days (weekly/biweekly cycle)
Production Transfer Between Plants or Locations This project transfers production of a product, line, or process from one facility to another, including documentation handoff, tooling relocation, and revalidation at the receiving site. Total Duration: 80-110 working days
Scrap & Rework Reduction This initiative reduces product scrap and rework on the floor through defect tracking, root cause analysis, and process or operator interventions. Estimated Duration: 40-60 working days
Shift Handoff Communication & Issue Logging Protocol This recurring project ensures smooth communication between shifts via structured handoff meetings, logs, and escalation protocols. Estimated Duration: 3-6 working days (recurs daily/weekly)
Shop Floor Safety Audit & Corrective Action Loop This recurring project verifies plant safety compliance through formal audits, risk identification, and corrective action tracking. Estimated Duration: 7 working days (monthly cycle)
Supplier Delivery & Performance Monitoring This recurring project tracks supplier delivery accuracy, lead times, and defect rates to improve inbound supply chain reliability. Estimated Duration: 10-15 working days (monthly cycle)
Temporary Line Setup for Surge Capacity This project rapidly establishes a temporary production line to meet unexpected demand surges - including layout, equipment sourcing, staffing, and takedown plans. Estimated Duration: 30-50 working days
Utilities Upgrade & Load Management Project This project improves energy reliability and efficiency by upgrading electrical, compressed air, HVAC, or water systems to support operational load and future growth. Estimated Duration: 60-90 working days
Workforce Cross-Training & Labor Flexibility Program This project increases shop floor agility by training operators on multiple workstations and developing a skills matrix to manage shift flexibility. Estimated Duration: 40-60 working days

return to menu

PMO

Name Description and Estimated Duration (Days)
Annual Budget Planning and CapEx Tracking Facilitate annual planning for project budgets and capital expenditures. Monitor CapEx tracking on a monthly basis and adjust allocations as needed. Estimated Total Duration (Planning): 20-25 working days CapEx Tracking (Monthly): 5 working days/month
Business Continuity & Disaster Recovery Plan for Projects Develop a comprehensive business continuity and disaster recovery plan to ensure PMO projects can continue or recover quickly during major disruptions. Estimated Total Duration: 30-40 working days
Change Control Board (CCB) Meeting Preparation Prepare and facilitate Change Control Board meetings for evaluating change requests across strategic programs. Ensures changes are vetted for scope, cost, and timeline impact. Estimated Total Duration: 8-10 working days per cycle
Corporate Strategic Planning Cycle Facilitate the annual strategic planning cycle, aligning leadership teams on goals, initiatives, KPIs, and resource allocation. Estimated Total Duration: 45-60 working days
Cross-Site Best Practices Sharing Program Develop a structured program to capture, evaluate, and scale operational best practices across multiple manufacturing plants. Estimated Total Duration: 30-40 working days
Cybersecurity Compliance Program for Manufacturing Systems Coordinate cybersecurity hardening across manufacturing environments (SCADA, PLCs, MES) to comply with internal policies and external standards. Estimated Total Duration: 50-60 working days
DEI Initiative for Engineering & PMO Teams Implement diversity, equity, and inclusion (DEI) strategies tailored to engineering and project management teams to improve hiring, culture, and career progression. Estimated Total Duration: 35-45 working days
Digital Manufacturing Transformation Program Drive adoption of Industry 4.0 technologies (IoT, automation, digital twins, analytics) across production and operations to enhance visibility, flexibility, and efficiency. Estimated Total Duration: 120-140 working days
Energy Efficiency Project Tracker Implementation Implement a centralized system to track, prioritize, and report on energy efficiency initiatives across manufacturing facilities. Estimated Total Duration: 35-45 working days
ERP System Implementation Implement a new Enterprise Resource Planning system to streamline business operations across finance, inventory, production, and supply chain. Estimated Total Duration: 150-180 working days
Green CapEx Prioritization Framework Develop and implement a scoring framework to prioritize sustainability-focused capital expenditures (energy savings, water use reduction, emissions impact). Estimated Total Duration: 25-30 working days
Internal PMO Knowledge Base Setup Create an internal knowledge base for PMO processes, templates, tools, and best practices to standardize execution across programs. Estimated Total Duration: 30-40 working days
ISO 9001 Certification Project Obtain ISO 9001 certification by aligning QMS processes with ISO standards, conducting gap analysis, documentation, training, and audit readiness. Estimated Total Duration: 80-100 working days
IT/OT Convergence Strategy Implementation Develop and execute a strategy to converge Information Technology (IT) and Operational Technology (OT) systems to enable secure, scalable digital manufacturing. Estimated Total Duration: 60-75 working days
Kaizen Event Coordination Coordinate and facilitate a focused, short-duration continuous improvement (Kaizen) event to eliminate waste and enhance a specific manufacturing or office process. Estimated Total Duration: 15-20 working days
Lean Manufacturing Transformation Initiative Implement Lean principles to improve manufacturing efficiency, reduce waste, and enhance productivity across shop floor operations. Estimated Total Duration: 80-100 working days
Manufacturing Execution System (MES) Deployment Implement or upgrade a MES platform to integrate shop floor control, quality, and traceability into digital workflows. Estimated Total Duration: 100-130 working days
Manufacturing Leadership Development Program Design and deliver a structured development program for operations and PMO team members transitioning into leadership roles. Estimated Total Duration: 40-50 working days
Monthly Project Portfolio Review Review and evaluate the current status of all active projects within the portfolio to assess alignment with goals, timelines, budgets, and resource capacity. Conducted on a recurring monthly basis. Estimated Total Duration: 10 working days per cycle
New Product Development Program Develop and launch a new product from concept to market-ready stage, coordinating cross-functional teams across R&D, engineering, sourcing, manufacturing, and marketing. Estimated Total Duration: 120-150 working days
Plant Expansion or Facility Upgrade Program Oversee facility expansion or infrastructure upgrades to increase manufacturing capacity or introduce new capabilities. Estimated Total Duration: 100-130 working days
PMO Dashboard & KPI Reporting Update Maintain and update PMO dashboards with key metrics (schedule adherence, resource utilization, budget status, project health, etc.) on a biweekly or monthly cadence. Estimated Total Duration: 6-8 working days per update cycle
PMO Process Audit and Continuous Improvement Conduct regular audits of PMO processes (project initiation, tracking, closure, etc.) to ensure compliance and drive continuous improvement. Typically done quarterly or semi-annually. Estimated Total Duration: 15-18 working days
PMO Resource Capacity Planning Process Develop a forecasting and capacity management process to align resource availability with project portfolio demand. Estimated Total Duration: 25-30 working days
Product Lifecycle Management (PLM) System Deployment Deploy a PLM system to manage engineering changes, product data, and lifecycle workflows across design, manufacturing, and quality teams. Estimated Total Duration: 90-110 working days
Project Procurement Strategy Playbook Development Create standardized procurement strategies for different project types to streamline sourcing, manage risks, and improve delivery timelines. Estimated Total Duration: 30-35 working days
Quarterly Program Governance Reporting Prepare and deliver a comprehensive governance report summarizing major programs' performance, compliance to PMO standards, and alignment to corporate strategy. Occurs quarterly. Estimated Total Duration: 12 working days per cycle
Risk Register Review & Mitigation Plan Update Maintain an up-to-date risk register for strategic programs, identifying new risks, tracking status, and updating mitigation or contingency plans. Typically monthly or biweekly. Estimated Total Duration: 8-10 working days per cycle
SOX or Regulatory Audit Support for Project Controls Support Sarbanes-Oxley (SOX) or industry-specific regulatory audits by ensuring project financials and controls meet internal audit requirements. Estimated Total Duration: 20-30 working days (varies by scope)
Stage-Gate Governance Process Redesign Redesign or improve the PMO's stage-gate governance framework to align with strategic execution needs, increase adoption, and improve decision quality. Estimated Total Duration: 40-50 working days
Supply Chain Resilience & Risk Mitigation Strategy Develop and implement a strategy to identify, assess, and mitigate supply chain risks through scenario planning, diversification, and digital monitoring tools. Estimated Total Duration: 40-60 working days
Sustainability and ESG Compliance Program Create and launch an ESG (Environmental, Social, Governance) compliance initiative focused on emissions tracking, ethical sourcing, and sustainability reporting. Estimated Total Duration: 50-60 working days
Training and Onboarding for New PMs Provide structured onboarding for new project managers, including systems training, PMO methodology, tools walkthroughs, and mentorship assignments. Estimated Total Duration: 12-14 working days per onboarding cycle
Vendor Onboarding & Evaluation Process Standardize and manage onboarding of new vendors supporting PMO programs (consultants, IT partners, tooling, etc.) including compliance checks, scoring, and kickoff. Estimated Total Duration: 12-15 working days per onboarding cycle
Weekly Cross-Functional Program Status Sync Hold weekly cross-functional status meetings for large programs to ensure alignment, remove blockers, and track issues. Typically run for each major initiative. Estimated Total Duration: 5 working days per week (recurring)

return to menu

Quality & Regulatory Compliance

Name Description and Estimated Duration (Days)
Annual Document Control Review & Update Perform an annual review of all quality-related controlled documents (SOPs, policies, forms) to ensure accuracy, relevance, and alignment with regulatory and process changes. Total Duration: 20 working days per cycle
Annual Product Quality Review (PQR / APR) Summarize product performance annually to evaluate quality trends, deviations, complaints, CAPAs, and regulatory compliance, required for regulated products. Total Duration: 25 working days per product
Approved Supplier Requalification Tracker Conduct scheduled annual or biannual requalification of approved suppliers based on performance, audit results, and quality history. Total Duration: 18 working days per cycle
Audit Readiness Self-Assessment Checklist Routine self-assessment by departments to ensure audit-readiness across documentation, labeling, records, training, and procedures. Total Duration: 12 working days per cycle
Batch Record Review Review manufacturing batch records for completeness, accuracy, and compliance with product specifications and SOPs before final release. Total Duration: 12 working days per batch
Change Control Review & Approval Manage and review proposed changes to processes, equipment, materials, or documents through a formal change control board (CCB) review, risk assessment, and approval process. Total Duration: 14.5 working days per change cycle
Customer Complaint Management System Implementation Establish a structured, traceable system for logging, investigating, and responding to customer complaints in compliance with regulatory standards. Total Duration: 44 working days
Customer Quality Issue Investigation (8D Format) Systematic 8D investigation and resolution of customer complaints using structured root cause, corrective, and preventive actions. Total Duration: 18 working days
Deviation/Non-Conformance Report (NCR) Management Manage investigation, resolution, and documentation of deviations or NCRs from expected processes, specifications, or test results. Total Duration: 14 working days per NCR
Document Change Request (DCR) Workflow Structured workflow to manage updates to controlled documents through a standardized request, review, approval, and training process. Total Duration: 12 working days per DCR
Environmental Monitoring Review & Trending (for Cleanrooms) Consolidate and trend environmental monitoring results (microbial, particulate, etc.) for cleanroom compliance analysis. Total Duration: 12 working days per month
GMP Shop Floor Walkthrough & Observation Checklist Perform regular GMP compliance checks on production and warehouse areas to monitor adherence to hygiene, documentation, and safety requirements. Total Duration: 10 working days per walkthrough
Incoming Material Quality Inspection Inspect and verify conformance of raw materials, packaging, and components received from suppliers, including sampling, measurement, and defect logging. Total Duration: 10 working days per inspection cycle (rolling, varies by frequency)
Internal Audit Nonconformance Follow-Up Tracker Manages nonconformances identified during internal audits, ensuring root cause analysis, corrective actions, verification, and timely closure with complete documentation. Total Duration: 15 working days
Label Control and Inspection Verification Log Inspect incoming printed labels to ensure correctness of content, version, and supplier conformance prior to production use. Total Duration: 8 working days per label batch
Monthly Internal Quality Audits Conduct structured monthly internal audits to verify ongoing compliance with QMS procedures, regulatory standards, and continuous improvement initiatives. Each audit focuses on different departments or processes based on a pre-defined audit calendar. Total Duration: 16.5 working days per audit cycle
New Product Regulatory Approval (e.g., 510(k), CE Marking) Coordinate cross-functional activities for regulatory submission and approval of a new product, including documentation preparation, testing, and liaison with agencies. Total Duration: 60 working days
Ongoing CAPA Investigation & Resolution Execute and close out CAPA cases across departments on a rolling basis. Each cycle focuses on thorough investigation, root cause analysis, and verified resolution of assigned cases. Total Duration: 20 working days per CAPA cycle
Process Validation Protocol Development Develop a process validation protocol to confirm that manufacturing processes consistently produce products meeting quality requirements. Applies to regulated industries (e.g., med device, pharma). Total Duration: 43 working days
Product Labeling and Regulatory Updates Regularly review and update product labels to maintain alignment with regulatory requirements and product specification changes. Total Duration: 16 working days per update cycle
Product Quality Risk Assessment (FMEA or HACCP Implementation) Establish a structured process for identifying and managing product risks using Failure Modes & Effects Analysis (FMEA) or HACCP, depending on industry. This project will focus on risk mitigation for critical quality issues. Total Duration: 45 working days
QMS Dashboard Maintenance & Reporting Implement a fully ISO 9001-compliant Quality Management System, covering documentation, process control, training, auditing, and certification. Total Duration: 113 working days
Quality Manual and SOP Development Create a comprehensive Quality Manual and supporting SOPs that define organizational quality policies, procedures, and operational standards in line with regulatory requirements. Total Duration: 50 working days
Quarterly Regulatory Compliance Review Conduct a quarterly cross-functional review of compliance with applicable regulatory standards (e.g., FDA, ISO 9001, OSHA). This includes documentation checks, system reviews, and proactive identification of regulatory risks. Total Duration: 18 working days per quarter
Recall Preparedness Simulation Implement a fully ISO 9001-compliant Quality Management System, covering documentation, process control, training, auditing, and certification. Total Duration: 109 working days
Regulatory Intelligence & Monitoring Log System to track regulatory updates and proactively evaluate their impact on current processes, QMS, and product compliance. Total Duration: 10 working days per quarter
Supplier Quality Management Program Setup Set up a supplier management system including selection, audits, quality agreements, and risk-based tiering. Total Duration: 58 working days
Training Compliance Monitoring & Reporting Track employee training status against SOP requirements and issue monthly reports to ensure compliance with regulatory and internal standards. Total Duration: 10 working days per month

return to menu

Sales & Marketing

Name Description and Estimated Duration (Days)
Account-Based Marketing (ABM) Sprint Execute a focused ABM sprint targeting a short list of high-value accounts with personalized content, outreach, and sales collaboration. Estimated Total Duration: 25-30 working days per sprint
Brand Refresh or Repositioning Initiative Overhaul the visual identity, messaging, and voice of the brand to align with new market positioning or company direction. Estimated Total Duration: 45-60 working days
Channel Partner Enablement Program Launch a structured enablement program for distributors, resellers, or channel partners to improve product knowledge, sales tools, and alignment. Estimated Total Duration: 40-50 working days
Competitive Landscape Analysis Conduct a formal analysis of competitor positioning, offerings, pricing, and messaging to inform GTM strategies, sales enablement, and differentiation. Estimated Total Duration: 25-35 working days
Content Calendar Management & Production Maintain and execute a content calendar covering blogs, thought leadership, product updates, videos, and more to support SEO, lead generation, and brand awareness. Estimated Total Duration: 20-25 working days per month
Corporate Thought Leadership Program Establish a thought leadership program by featuring internal experts in blogs, interviews, events, and earned media opportunities. Estimated Total Duration: 30-40 working days
CRM Implementation or Upgrade Implement or upgrade a Customer Relationship Management (CRM) system to enhance visibility into sales pipelines, customer engagement, and marketing attribution. Estimated Total Duration: 60-75 working days
Customer Advisory Board Setup Establish a Customer Advisory Board (CAB) of top customers to provide strategic guidance, foster relationships, and test messaging or product ideas. Estimated Total Duration: 30-40 working days
Customer Data Enrichment Project Establish a Customer Advisory Board (CAB) of top customers to provide strategic guidance, foster relationships, and test messaging or product ideas. Estimated Total Duration: 30-40 working days
Customer Onboarding Journey Optimization Redesign and improve the onboarding journey to help new customers achieve success faster and reduce churn. Estimated Total Duration: 30-40 working days
Customer Segmentation & Targeting Refresh Reassess and update customer segmentation to refine targeting, personalize marketing, and inform sales prioritization. Estimated Total Duration: 30-40 working days
Customer Testimonial & Case Study Production Capture and publish testimonials or case studies from satisfied customers to support marketing and sales collateral. Estimated Total Duration: 15-20 working days per project
Digital Advertising Performance Review & Optimization Analyze and optimize digital ad performance across platforms (Google Ads, LinkedIn, display, retargeting) on a monthly basis. Estimated Total Duration: 8-10 working days per month
Go-To-Market Strategy Development Create a GTM strategy for a new product, service line, or market segment. Includes research, positioning, channel strategy, and sales alignment. Estimated Total Duration: 30-40 working days
Marketing Automation System Deployment Deploy a marketing automation platform (e.g., HubSpot, Marketo, Pardot) to manage email campaigns, lead nurturing, scoring, and marketing analytics. Estimated Total Duration: 50-65 working days
Monthly Email Campaign Execution Plan, build, and execute monthly outbound email campaigns to nurture prospects, promote content, and drive conversions. Estimated Total Duration: 10-12 working days per cycle
Monthly Lead Nurturing Workflow Updates Optimize and refresh lead nurturing workflows based on engagement data and new content assets. Estimated Total Duration: 8-10 working days per month
New Market Entry Strategy Plan and execute the entry into a new regional or vertical market, including competitive analysis, messaging localization, and go-to-market alignment. Estimated Total Duration: 40-50 working days
Pricing Strategy Development Build or refresh a pricing strategy aligned to customer value, market trends, margin targets, and sales effectiveness. Estimated Total Duration: 30-40 working days
Product Launch Marketing Campaign Develop and execute a comprehensive marketing campaign to support the launch of a new product. This includes messaging, content creation, sales enablement, and multi-channel promotion. Estimated Total Duration: 45-60 working days
Quarterly Marketing Campaign Planning & Execution Plan and execute a quarterly integrated marketing campaign aligned with sales goals, featuring multiple channels like email, paid media, and content. Estimated Total Duration: 25-30 working days per cycle
Sales & Marketing SLA Development Create a documented Service-Level Agreement (SLA) between sales and marketing to align lead definitions, follow-up expectations, and shared goals. Estimated Total Duration: 20-25 working days
Sales Compensation Plan Redesign Redesign sales compensation structure to align with company growth goals, profitability, and rep behavior. Estimated Total Duration: 35-45 working days
Sales Playbook Creation & Rollout Create a comprehensive sales playbook that outlines processes, messaging, templates, and tools for the sales team to improve efficiency and consistency. Estimated Total Duration: 30-40 working days
Sales Training & Onboarding for New Reps Provide new sales hires with training on products, CRM tools, processes, and messaging to ensure a fast and effective ramp-up. Estimated Total Duration: 20-25 working days per hire
Social Media Strategy & Execution Plan, produce, and publish social media content to drive awareness, engagement, and conversions -- typically handled weekly and monthly. Estimated Total Duration: 12-15 working days per month
Trade Show / Industry Conference Planning Plan and execute the company's presence at a trade show or industry conference to generate leads, showcase products, and build brand awareness. Estimated Total Duration: 40-50 working days
Voice of the Customer (VoC) Program Launch Design and implement an ongoing Voice of the Customer (VoC) program using surveys, interviews, and data collection to inform product development, marketing, and customer experience strategies. Estimated Total Duration: 35-45 working days
Website Redesign & Optimization Redesign the company website to improve UX, SEO, and lead generation. Includes strategy, wireframes, development, testing, and launch. Estimated Total Duration: 60-75 working days
Weekly Sales Funnel & Forecasting Review Support weekly sales funnel review meetings to assess pipeline health, track lead progression, and update forecasts. Estimated Total Duration: 5 working days per week (recurring)

return to menu

Supply Chain & Procurement

Name Description and Estimated Duration (Days)
Business Continuity Planning for Key Suppliers Formalizes contingency plans for suppliers critical to business operations to ensure resilience against disruption. Total Duration: 29 working days
Circular Supply Chain Strategy Development Explores reuse, recycling, and circular sourcing opportunities to reduce waste and support sustainability. Total Duration: 31 working days
Conflict Minerals & Supplier Ethics Reporting Collects declarations and evidence from suppliers to ensure ethical sourcing in compliance with regulations like Dodd-Frank, REACH, and RoHS. Total Duration: 30 working days
Critical Part Buffer Stock Strategy Develops a buffer stock plan for high-risk, long-lead-time, or sole-source components to reduce downtime. Total Duration: 27 working days
Engineering - Procurement Cost Collaboration Program Aligns engineering and procurement to identify alternate specs, vendors, or design changes to reduce cost. Total Duration: 27 working days
eSourcing Platform Implementation Deploys digital platform to manage RFx, supplier negotiations, and e-auctions. Total Duration: 32 working days
Global Supplier Consolidation Initiative Rationalizes supplier base to reduce redundancy, lower costs, and improve relationship depth across global vendors. Total Duration: 33 working days
Import/Export Trade Compliance Program Establishes internal controls to manage customs declarations, tariffs, and global trade documentation compliance. Total Duration: 30 working days
Inventory Optimization Project Rationalizes inventory to reduce carrying costs, prevent stockouts, and improve turns. Total Duration: 30 working days
Lead Time Reduction Initiative A targeted effort to analyze current lead times and implement reductions through better planning, collaboration, or supplier changes. Total Duration: 26 working days
Logistics Partner Coordination & Scheduling Ensures transportation bookings and shipment tracking are performed consistently for inbound and outbound logistics. Total Duration: 14 working days per shipment window
Monthly Demand Forecasting & Supply Planning Ensures accurate material and product availability through monthly forecasting and alignment of procurement and production. Total Duration: 20 working days (completed monthly)
New Product Introduction (NPI) Sourcing Support Supports engineering and operations by sourcing new materials, securing quotes, and onboarding suppliers during new product development. Total Duration: 30 working days
New Supplier Development for Critical Parts Identifies and qualifies new suppliers for critical items to improve supply assurance, cost, or lead time. Total Duration: 32 working days
Procure-to-Pay (P2P) Process Cycle Facilitates the full cycle of routine purchasing activity including requisitions, orders, receipts, and payments. Total Duration: 15 working days (repeats per purchasing cycle)
Procurement Dashboard Automation Automates real-time dashboards to track procurement KPIs such as savings, PO cycle time, supplier performance, and inventory turnover. Total Duration: 26 working days
Procurement Policy & SOP Standardization A governance initiative to unify procurement processes across plants or business units. Total Duration: 27 working days
Procurement Process Automation Implementation Implements automation tools to streamline procurement workflows such as PR-to-PO, approvals, and vendor communication. Total Duration: 35 working days
Procurement Spend Analysis & Categorization Identifies savings and sourcing opportunities by analyzing and classifying historical procurement spend. Total Duration: 26 working days
Procurement Talent Development Program Builds a structured learning, mentoring, and skills growth framework for procurement staff. Total Duration: 26 working days
Purchase Order Tracking & Follow-Ups Weekly cycle of monitoring open POs, addressing delays, and ensuring timely goods receipt. Total Duration: 11 working days per cycle
Raw Material Cost Reduction Program A structured initiative to lower input costs through negotiation, substitution, and strategic buys. Total Duration: 31 working days
Regular Reorder & Restocking Process Repetitive cycle for monitoring stock levels, triggering reorders, and restocking inventory for routine items. Total Duration: 12 working days per cycle
Reshoring / Nearshoring Feasibility Study Evaluates the business case for moving sourcing from overseas to domestic or regional suppliers. Total Duration: 27 working days
Reverse Logistics & Returns Process Design Establishes procedures for handling returned goods and materials, including defective parts, warranty items, and reusable packaging. Total Duration: 29 working days
Routine Request for Quotation (RFQ) Cycle A repeatable cycle to collect and compare vendor pricing for routine parts or services before purchase. Total Duration: 13 working days per cycle
Routine Supplier Performance Review A recurring quarterly/monthly process to assess supplier performance using KPIs and qualitative feedback. Total Duration: 18 working days
Scope 3 Emissions Data Collection Engages suppliers to gather data for carbon emissions reporting related to purchased goods and services. Total Duration: 28 working days
Strategic Sourcing Initiative (Manufacturing) Re-engineers sourcing strategy to drive cost savings, quality improvement, and supplier consolidation. Total Duration: 36 working days
Supplier Compliance & Documentation Check A monthly/quarterly check to ensure all supplier documentation is up to date for regulatory and audit readiness. Total Duration: 14 working days
Supplier Financial Health Monitoring Program Implements a system to proactively assess supplier financial risk using third-party data, payment behavior, and early warning indicators. Total Duration: 30 working days
Supplier Insurance Compliance Audit Validates that all suppliers maintain current, adequate insurance coverage (e.g., liability, product, cyber) per company policy. Total Duration: 25 working days
Supplier Onboarding & Qualification Program Ensures new suppliers are thoroughly vetted, qualified, and integrated into supply chain operations. Includes evaluation, system setup, and training. Total Duration: 32 working days
Supplier Recognition & Relationship Program Formalizes a quarterly/yearly engagement program to recognize top-performing suppliers and build long-term relationships. Total Duration: 25 working days
Supplier Scorecard Program Development Establishes a standardized supplier scorecard system to evaluate performance based on quantitative and qualitative KPIs. Total Duration: 28 working days
Supply Chain Risk Assessment & Mitigation Plan Identifies risks across supply tiers and designs mitigation actions for operational resilience. Total Duration: 31 working days
Sustainability & ESG Compliance in Supply Chain Builds compliance and reporting capabilities to meet environmental, social, and governance (ESG) requirements in the supply chain. Total Duration: 34 working days
Vendor Contract Review & Renegotiation Audits and renegotiates vendor agreements to optimize terms, pricing, and delivery conditions. Total Duration: 27 working days
Weekly Inventory Reconciliation & Reporting Recurring reconciliation between system inventory and physical stock counts across storage locations. Total Duration: 10 working days per cycle
Weekly Procurement KPI Reporting Tracks weekly procurement performance across key indicators like savings, delivery adherence, and cycle time. Total Duration: 10 working days per cycle

return to menu

Did this answer your question? Thanks for the feedback There was a problem submitting your feedback. Please try again later.

Still need help? Contact Us Contact Us